Safety Operation Instructions For Small Jaw Crusher

Last Update:2020-05-02 07:10:38

At present, the application of small jaw crusher is very extensive, and its application range is also all over the production fields. For many users, after purchasing the equipment, in addition to timely check whether the equipment is damaged in the process of transportation, more carefully read the installation and operation instructions of jaw crusher and relevant precautions, so as to ensure the efficient operation of the equipment. What should be paid attention to when installing the small jaw crusher?

In the process of installation of small jaw crusher, first of all, operators need to have a basic understanding of the basic structure, working principle and performance of the equipment in advance, and then determine the installation process according to the safety operation procedures of jaw crusher. The installation site is generally equipped with professional lifting equipment. After checking the anchor bolts and anchor bolts of the equipment, it is necessary to use the lifting equipment to conduct fine assembly of the efficient energy-saving crusher. Generally, the deviation of the center position of the reserved holes of the anchor bolts should be less than 10 mm.

The manual of jaw crusher points out that the vibration absorbing material should be filled between the small jaw crusher and the foundation in general, so as to prevent the occurrence of the phenomenon that the foundation is not firm during the operation of the equipment, thus affecting the operation of the production line. When installing the body of the small jaw crusher, ensure that the machine surface is straight, and there is no ash leakage at the interaction between the foundation surface and the body. The foundation bolts of the equipment need to be reinforced and tightened, and there should be enough simplification under the foundation to facilitate the inspection and repair of the equipment. After the crusher motor is installed, it needs to be equipped with special safety drive belt protective cover according to the actual situation to prevent the motor from entering too much dust. For the impact crusher, the gap between the plate hammer and the impact plate generally needs to be adjusted according to the actual work demand. When the adjustment is finished, the sleeve nut shall be tightened in time, so as to effectively prevent the nut from loosening and the impact of the plate hammer of the jaw crusher in the work.

There are many precautions to be paid attention to when installing the small jaw crusher. I believe that you have a detailed understanding of this through the above introduction. The jaw crusher shall be installed in strict accordance with the instructions. It is hoped that all operators can install the equipment in strict accordance with the installation requirements and operate step by step to ensure that there is no risk. Only in this way can the crusher give full play to its great working advantages, reduce the occurrence rate of faults in production, and bring excellent production benefits to the enterprise.

NEED A QUESTIONS?

If you are interested in our products, or have any questions for us, you can click the button below

Contact Us

LOCATION

After long-term technical research and international exchanges, the quality and technical content of Caesar's products have reached the first-class level in the world, and have been widely recognized and praised in the international market; the products are exported to more than 160 countries, such as the United States, Russia, etc

Get Price Now