How To Test Run Pe400x600 Jaw Crusher

Last Update:2020-05-05 18:14:38

Jaw crusher has made great contribution to the modernization of our country, especially since the reform and opening up, many infrastructure construction can not do without the help of 400 * 600 jaw crusher. Before leaving the factory, the crusher generally needs to be commissioned, so as to understand the operation efficiency and existing problems of the equipment, so that the manufacturer can make timely improvement. Next, let's see how to run pe400 × 600 jaw crusher before delivery.

Generally speaking, the 400 * 600 jaw crusher needs to carry out relevant trial operation before leaving the factory, which requires two hours of no-load operation, and then the heavy load test. Before the installation of the equipment, it is necessary to obtain the relevant factory test report, and conduct the trial operation of the equipment in combination with the content of the report. When the pe400 × 600 jaw crusher is running, it is necessary to ensure that there is no damage to the parts and that the bolts at the connecting parts are firmly connected.

Before the trial operation of pe400 × 600 jaw crusher, it is required to clean the lubrication system and hydraulic system comprehensively. The cleanliness must be strictly in accordance with the regulations. At the same time, the operators of the equipment need to be trained strictly before they can work. The 400 * 600 jaw crusher needs reliable grounding measures, and the cable of the equipment also needs corresponding protection measures. It is strictly prohibited to adjust the equipment during operation. The correct way is to stop the machine first, and then carry out inspection and maintenance, which can effectively prevent the occurrence of safety accidents.

During the test run of pe400 × 600 jaw crusher, the following matters need to be paid attention to. During the operation, it is generally the gradual transition from components to joint operation. These steps need to be carried out step by step, and the next step can only be carried out after one step is qualified. During the operation of 400 * 600 jaw crusher, it is necessary to add lubricating oil in time, clean the oil pipeline regularly and replace the damaged parts in time, so as to ensure the friction between the equipment to be reduced to a low level.

The 400 * 600 jaw crusher needs to carry out strict trial operation before it is put into operation, which is a prerequisite to ensure the safe production of the equipment. Relevant operators must pay attention to the trial operation of the equipment, which can not be ignored. Only after the trial operation is passed, can the excellent quality of the equipment be guaranteed, and each pe400 × 600 jaw crusher produced can meet the standard, so as to ensure the lower failure rate and very large production efficiency of the user in the production.

NEED A QUESTIONS?

If you are interested in our products, or have any questions for us, you can click the button below

Contact Us

LOCATION

After long-term technical research and international exchanges, the quality and technical content of Caesar's products have reached the first-class level in the world, and have been widely recognized and praised in the international market; the products are exported to more than 160 countries, such as the United States, Russia, etc

Get Price Now